Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/06/2005 | ENGINEERING - FINAL | Approved | C OF O APPROVED. | |
| 01/04/2005 | ENGINEERING - FINAL | Partial Approval | SEE PREVIOUS COMMENTS AS NOTED FROM THE INSPECTION CONDUCTED ON 01/03/2005. | |
| 01/03/2005 | ENGINEERING - FINAL | Partial Approval | SEE PREVIOUS COMMENTS AS NOTED ON THE INSPECTION DATED 12/29/2004. A REVISION AND SIGN OFF FROM ENGINEERING AND ZONING IS REQUIRED FOR THE DELETED ASPHALT CONCRETE PARKING LOT. | |
| 12/29/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O. * CLEAN UP AND REMOVE ALL TRASH AND CONSTRUCTION DEBRIS. STABILIZE REAR PARKING AREA WITH EITHER DECORATIVE ROCK OR PAVING. GRASS WILL BE GROWN IN ON THE WESTERN PARIMETER AS A STABILZER BETWEEN THE DWELLING AND THE SIDEWALK. |