Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 09/03/2004 |
ELECTRIC - INTERMEDIATE |
|
Approved |
IVRS - Inspection :* |
| 08/24/2004 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection :* |
| 08/23/2004 |
ELECTRIC - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection :*/NOT READY 1) MAIN BONDING JUMPER TO CONNECT TO GROUNDING ELECTRODE CONDUCTOR TERMANAL BAR. CAN NOT USE CAN AS A PATH TO GROUND. 2) BONDING JUMPERS T BE SIZED PER 250-02 & 250.66 3)BOND BUSHING NEEDS CONDUCTOR & BOND GUTTER ENCLOSURE 4) ANCHOR BOLT NOT INSTALLED 5) REJECTION PINS ARE NEEDED. |
| 08/13/2004 |
ELECTRIC - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) CANCELLED BY CONTRACTOR |
| 08/04/2004 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection :OK RECESSED CANS IN SOFFITS |
| 08/03/2004 |
ELECTRIC - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) CANCELLED BY CONTRACTOR |
| 07/29/2004 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection :*/ 1) OK 3/4" RIDGID AND 1 1/2" PVC BELOW GARAGE FLOOR 2) OK STUD WALLS |
| 07/21/2004 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection :2-2" 1-4" 3-1" PVC INTRENCH TRANSMETER TO BUILDING |
| 07/16/2004 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection :*/ 1) OK 1 1/2" PVC FOR ? UNDER SLAB-NOTE: YOU HAVE A LITTLE OVER 270 DEGREE SO FAR IN RUN |
| 07/12/2004 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection :*/ 1) OK 3RD LIFT |
| 07/01/2004 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection :*/ 1) SECURITY CABLE NOT LISTED FOR USE IN MORTAR 2) OK 1ST AND 2ND LIFTS |