| 12/08/2004 | ENGINEERING - FINAL | Approved | ALL PREVIOUSLY NOTED COMMENTS HAVE BEEN TRANSFERRED TO THE GRADING PERMIT T01BU01918. | |
| 11/22/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. 1. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T01BU01918 IS COMPLETED AND APPROVED. 2. GRADE INTERCEPTOR CHANEL TO GROUND ELEVATION OF 40.15 TO EXPOSED 3' LOW FLOW PIPES IN CATCH BASIN. 3. STABILIZE SLOPES AT THE SOUTH AND EAST PERIMETERS OF THE BUILDING. 1:1 SLOPES REQUIRE GROUTED ROCK RIPRAP. 2:1 SLOPES REQUIRE ROCK RIPRAP OVER FILTER FABRIC. 3:1 - 4:1 SLOPES REQUIRE DECOMPOSED GRANITE OR RE-SEEDING 4. REPAIR EROSION DAMAGE AT THE WATER HARVEST BASIN AT THE NORTHEAST CORNER OF THE SITE. 5. CLEAN-OUT NORTHEAST RETENTION/DETENTION BASIN AND VERIFY 12 HOUR PERCOLATION RATE. |
|
| 09/13/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. 1. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T01BU01918 IS COMPLETED AND APPROVED. 2. PROVIDE CURB AT THE NORTHEAST SIDE OF THE SITE AND ADJACENT TO THE TRASH ENCLOSURE. 3. PROVIDE CONCRETE HEADERS AT NORTHEAST AND SOUTH SIDE OF SITE. 4. PROVIDE WATER HARVEST AREAS PER PLAN ON THE NORTHEAST AND SOUTH SIDE OF PROJECT. 5. GRADE SOUTH BASIN PER PLAN DETAILS "C" AND "D". . 6. PROVIDE THE 1:1 GUNITE SLOPES PER EAST BASIN DETAIL "E". 7. GRADE INTERCEPTOR CHANEL TO GROUND ELEVATION OF 40.15 TO EXPOSED 3' LOW FLOW PIPES IN CATCH BASIN. 8. STABILIZE SLOPES AT THE SOUTH AND EAST PERIMETERS OF THE BUILDING. 1:1 SLOPES REQUIRE GROUTED ROCK RIPRAP. 2:1 SLOPES REQUIRE ROCK RIPRAP OVER FILTER FABRIC. 3:1 - 4:1 SLOPES REQUIRE DECOMPOSED GRANITE. 9. PROVIDE ONE-WAY AND RIGHT TURN ONLY SIGNS AT NORTHEAST ENTRANCE. |
|
| 09/03/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T01BU01918 IS COMPLETED AND APPROVED. |