Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2004 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :*/ 1) CORRECTIONS MADE OK, OK TO COVER ALL AREAS 2) REVISED PLANS ON SITE | |
| 07/23/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :PLUMBING IS PER ARCHITECT LETTER DATED 7-21-04. lETTER IS NOT APPROVED BY COT PLAN CHECK. LETTER MUST BE APPROVED | |
| 07/20/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :NEED CORRECT TYPE OF MATERIAL, PLAN CALLS FOR CASR IRON UNDERGOUND OR PROVIDE STAMPED LETTER FROM ENGINEER STATING PVC SCH40 DWV OK FOR ROUGH SOIL PROVIDE CORRECT TRANSITION COUPLING FOR ABS TO PVC GREEN GLUE NOT ACCEPTABLE |
|
| 07/16/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :*/ 1) 1 1/2" HORIZONTAL VENT EXCEEDS ALLOWABLE LENGTH VENT MUST BE INCREASED ONE PIPE SIZE FOR IT'S ENTIRE LENGTH 2) UNDERGROUND NOT INSTALLED PER PLAN-SEE DETAIL P-1 |