Permit: T04CM02013

Parcel: 137313730

Inspection Status: Partial Approval

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
04/04/2005 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O AT THIS TIME, FINAL NOT TO BE GIVEN UNTIL THE FOLLOWING ITEMS ARE COMPLETE.
1) COMPLETE THE BASIN AS SHOWN ON THE SOUTH SIDE OF THE SITE. A DIRT BERM IS MISSING ON EAST END OF THE BASIN.
2) INSTALL THE DOWN DRAIN PIPES AND GUTTERS ON THE NORTH AND SOUTH SIDE OF THE BUILDING.
3) INSTALL THE TEMPORARY BASIN AS SHOWN ON THE APPROVED PLANS OR HAVE THE ENGINEERING DEPARTMENT SIGN OFF ON THE REMOVAL OF SAID ITEM NOTED ON THE PLANS.
4) NORTH AND SOUTH SIDEWALKS ADJACENT TO THE BUILDING ARE NOT 4 FEET WIDE AND NEED TO BE WIDENED. OR THEY NEED TO BE APPROVED AS IS BY THE ENGINEERING DEPARTMENT AND NOTED ON THE AS-BUILT DRAWINGS.
5) GENERAL CLEANUP OF THE SITE IS REQUIRED FOR THE REMOVAL OF ALL TRASH AND DEBRIS.
04/04/2005 ENGINEERING - FINAL Approved THIS SITE HAS BEEN APPROVED FOR FINAL AFTER LOREN MAKUS REVIEWED AND VERIFIED THAT THE TEMPORARY BASIN WAS NOT NEEDED SINCE THE ADJACENT PROPERTY IS TO BE DEVELOPED UNDER A DIFFERENT GRADING AND BUILDING PERMIT.
03/31/2005 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O AT THIS TIME, FINAL NOT TO BE GIVEN UNTIL THE FOLLOWING ITEMS ARE COMPLETE.
1) COMPLETE THE BASIN AS SHOWN ON THE SOUTH SIDE OF THE SITE. A DIRT BERM IS MISSING ON EAST END OF THE BASIN.
2) INSTALL THE DOWN DRAIN PIPES AND GUTTERS ON THE NORTH AND SOUTH SIDE OF THE BUILDING.
3) INSTALL THE TEMPORARY BASIN AS SHOWN ON THE APPROVED PLANS OR HAVE THE ENGINEERING DEPARTMENT SIGN OFF ON THE REMOVAL OF SAID ITEM NOTED ON THE PLANS.
4) NORTH AND SOUTH SIDEWALKS ADJACENT TO THE BUILDING ARE NOT 4 FEET WIDE AND NEED TO BE WIDENED. OR THEY NEED TO BE APPROVED AS IS BY THE ENGINEERING DEPARTMENT AND NOTED ON THE AS-BUILT DRAWINGS.
5) GENERAL CLEANUP OF THE SITE IS REQUIRED FOR THE REMOVAL OF ALL TRASH AND DEBRIS.