Permit: T04CM02010

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T04CM02010

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
03/25/2005 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
01/13/2005 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :* SECOND FL TUBS AND SHOWERS OK TO COVER
01/12/2005 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
1) REVISED PLAN NOT ON SITE
09/09/2004 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*/1)UNIT #3 2ND FLOOR ABS DWV OK
WATER TEST OK
2)UNITS #2 & #3 ON THRID FLOOR ABS DWV OK
WATER TEST OK
3)NEED TO SEE FINAL CONNECTIONS AND TUVBS AND ALL WATER PIPING
4)UNIT ONE SECOND FLOOR
UNDER FLOOR PLUMBING OK
WATER PIPING OK
OK TO COVER
09/08/2004 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
09/07/2004 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*/1)3RD FLOOR UNIT ONE ABS DWV THRU ROOF-OK WATER TEST OK
08/30/2004 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*/PA-UNIT #2 ONLY-PARTIAL
TEST ON WSTE VENT S & WATER PROVIDE APPROVED REVISED PLAN ON LOCATION OF WATER METER?
NEED DIRECTION ON FIRE WALLS
07/26/2004 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*/ 1) ABS APPROVED BY GP ENGINEERING J.Z. 2) WASTE LINE AT C-5 AND 4D TEST OK 3) OK TO BACKFILL
07/14/2004 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*/ 1) PLEASE INSTALL AS PER APPROVED PLAN OR PROIVDE AN APPROVED REVISED PLAN AT TIME OF INSPECTION
07/06/2004 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*/ 1) 10' HEAD FOR WATER TEST ON WASTE AND VENT OK 5 PSI AIR TEST MINIMUM AT TIME OF INSPECTION
06/16/2004 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*/ POST YOUR ADDRESS. 2) NEED APPROVED PLAN ON SITE.