Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 10/12/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :* |
| 10/06/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
1) 3/4" GAS LINE TO 100,000 BTU ROOF TOP UNIT PRESSURE OK 2) PLAN SHOWS GAS FIRED H20 HTR, NO PIPE RUN TO THIS UNIT ? ELECTRIC NOT SHOWN ON PLAN FOR H20 HTR? 3) LUS 46 HANGERS AT GLU LAM TO TRUSS CONNECTION REMOVE SHEETROCK SCREWS AND INSTALL 16D COMMON NAILS 4) RED BRICK VENEER BEING INSTALLED WITHOUT VAPOR BARIIER, I TOLD THE MASON |