Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2004 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 08/16/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/DENIED-10EAST BEARING WALL MUST BE FRAMED AT 16" O.C. 2)PROVIDE CRIPPLE STUDS ABOVE ALL HEADERS AT 16" O.C. MAX 3)SPLICES IN DOUBLE TOP PLATES CANNOT OCCURE WITHIN 48" OF EACH OTHER 4) ROOF SHOATHING? MUST BE NAILED AT 6" ON CENTER ALL SUPPORTED ENDS & EDGES AND 12" IN FIELE? 5)EAST BEARING WALL MUST HAVE ANACHOR BOLTS AT 32" O.C. 6)H2.5 CONNECTION TO TJI EAST END MUST HAVE EWB STIFFNERS 7)PLAN CALLS FOR DOUBLE? 2X10 HEADER - 2X6 REVISION MUST BE APPROVED |
|
| 08/13/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : Work is not complete enough to inspect.| 950*/ 1) SIDING MUST BE NAILED AT 6" ON CENTER ON EDGES AND ENDS AND 12" IN FIELD 2) ROOF RAFTERS NOT INSTALLED |