Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2004 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 10/13/2004 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999*/SEE NOTES FROM 10/12/04 INSPECTION AND MAKE WATER TIGHT ALL FIXTURES |
|
| 08/17/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :AIR PRESSURE TEST OF 50LBS ON WATER DISTRIBUTION OK SHALL SEE INSTALLATION OF CLOSET FLANGES PRIOR TO SETTING WATER CLOSETS |
|
| 08/07/2004 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) SHALL PROVIDE METER PRESSURE OR AIR PRESSURE TEST OF 50 POUNDS MINIMUM ON WATER DISTRIBUTION 2) SOIL WATER TEST IS OK |
|
| 08/05/2004 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) SHALL PROVIDE WATER TEST ON WASTE AND VENT SYSTEM TO TOP OF VENTS THRU ROOF |