Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2004 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :*/ CORRECTION MADE. WASTE VENT AND WTR TEST THRU ROOF OK. H20 WTR TEST OK. | |
| 06/23/2004 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1)WASTE AND VENT WTR TEST TO BE THRU ROOF. 2) SUPPORT ALL PIPING AT APPROPRIATE INTERVALS WITH APPROVED METHODS. 3) PROVIDE SEPERATION ON HOT AND COLD PEX TUBING. 4) WHERE IS YOUR KITCHEN SINK DRAIN. 5) INSTALL PER PLAN. THIS MAY NOT BE A COMPLETE LIST. HAVE YOUR PLBR PRESENT AT TIME OF NEXT INSP. |
|
| 06/18/2004 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) MUST USE DIRECTIONAL FITTING FOR FLAT VENT AT WTR CLOSET. 2) RETEST SYSTEM. |