Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T04CM01855
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/08/2004 | ELECTRIC - FINAL | Approved | ||
06/07/2004 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) PLAN SHOWS 60/3 20AMP WITH 3 #8'S TO 15KVA TRANS TO A PANEL WITH 50A MAIN CB. ON SITE WE HAVE 60/3 DISCONNECT 30AMP FUSE ON #10 WIRE PLAN DOES NOT REFLECT WHAT IS INSTALLED. 2) PANEL HAS A 90A CB NOT A 50A CB. 3) PANEL SCHEDULE NEEDS TO BE WRITTEN IN, USE CORRECT SCREWS ON PANEL COVER, 3" SELF TAPPER DO NOT BELONG - CAN DAMAGE WIRING. 4) IF TRANS INSTALLED IN CEILING WAS NOT INSPECTED PRIOR TO ENERGIZING HAVE ELECTRICIAN ON SITE NEXT INSP. TO DISCONNECT AND INSPECT - NEED CORRECT APPROVED REVISION. VERIFY WHAT GROUND TO TRANS IS CONNECTED TO. |