| 04/20/2005 | ENGINEERING - FINAL | Approved | ||
| 04/15/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. 1.PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T04BU02308 IS COMPLETE AND APPROVED. 2. PROVIDE A 24' 2'' DRIVEWAY NEXT TO THE SIDEWALK ON THE WEST SIDE OF BUILDING. CURRENT DIMENSION IS 21'. 3. PROVIDE A GATE AT THE SIDEWALK WEST OF BUILDING. 4. PROVIDE A 4' SIDEWALK ON THE NORTH AND WEST PERIMETERS AS SHOWN ON THE PLAN, KEYNOTE 17. 5. PROVIDE BICYCLE PARKING AT (2) LOCATIONS PER DETAIL 4 KEYNOTE 32. 6. PROVIDE A DO NOT ENTER SIGN AT THE NW ENTRANCE DRIVE PER KEYNOTE 33. 7. PROVIDE A HANDICAP PARKING SIGN SEE KEYNOTE 35. 8. PROVIDE (3) PARKING STALLS WITH STRIPING NEAR THE NW CORNER OF THE BUILDING. SEE KEYNOTE 23. |
|
| 03/24/2005 | ENGINEERING - FINAL | Partial Approval | 1.TEMP C OF O APPROVED PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T04BU02308 IS COMPLETE AND APPROVED. 2. PROVIDE SIDE WALK SCUPPER AT ROOF DOWN SPOUT 3. PROVIDE PIPE BOLLARDS PER COT STAND DETAIL |