Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/10/2004 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection :*/ OK FINAL |
| 06/09/2004 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection :*/ 1) BOXES MORE THAN ΒΌ" FROM BOX TO SURFACE TO USE AN APPROVED EXTENDER RING 370-20 - METAL NOT APPROVED. 2) GROUND SWITCHES 380-9. 3) A DISCONNECTING MEANS FOR WTR HTR IS NEEDED. |
| 06/02/2004 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection :*/ 1) CORD NOT ALLOWED TO PASS THROUGH CEILING OR BE ABOVE CEILING. 2) VDV CABLES LAYING ON GRID. 3) SCREWS TO BE AT 4 CORNERS ON LIGHT FIXTURES. 4) FINISH WTR HTR INSTALLATION. |