Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2004 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :*/1)SOIL WATER TEST IS OK 2)OVERHEAD WATER DISTRIBUTION IS OK 3)NOTE: SHALL USE A DIRECTIONAL FITTINGS FOR EXTENDING OF C.O. IN WEST UNIT @ LAVATORY | |
| 10/12/2004 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :*/1)TRAP ARMS TO BE INSTALLED AT 1/4" PER FOOT 2)1 1/2" TRAP ARM MAY NOT EXCEED 3'6" DEVELOPED LENGTH 3)HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP 4)ALL HORIZONTAL OVER HEAD PIPING TO BE SUPPORTED. 5)PLUMBERS TAPE NOT AN APPROVED STRAP | |
| 10/11/2004 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :NO TEST ON ABS PLUMBERS TAPE IS NOT APPROVED STRAP |