Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/30/2004 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection :* |
| 06/11/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection :*/ 1) WATER TEST UNDERGROUND ONLY 3" BLDG DRAIN CONNECTED TO EXISTING, EXISTS SOUTH 3 X 2 COMBO FOR LAUS, 3" SWEEP TO 3" FIG 5 FOR STOOLS OK 2) HAVE YOUR ARCHITECT PROVIDE WASTE, VENT AND WATER ISOMETRIC OF YOUR INSTALLATION CITY APPROVED 3) 3" FULL SIZE UPPER TERMINAL CLEANOUT SHALL BE REQUIRED 4) 2" CLEANOUT TEE SHALL BE REQUIRED AT LAVS 5) WATER TEST THRU ROOF INTERMEDIATE VENT PIPING 6) CLOSET FLANGE TO BE FLUSH WITH DRAINAGE PIPE AT STOOLS. PRIOR TO SETTING STOOLS 7) COVER AT OWN RISK |