Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/29/2004 | FRAMING | Approved | IVRS - Inspection :* | |
| 07/28/2004 | FRAMING | Denied | IVRS - Inspection :SEAL LATH PENETATION UNDER KITCHEN WINDOW FLEX DUCT INSIDE RADIUS OF ANY BEND SHOULD NOT BE LESS THAN 1/2 THE INSIDE DIAMETER OF THE DUCT |
|
| 07/27/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) WILL APPROVE FRAMING WHEN ALL TRADES ARE COMPLETE 2) NAIL PROTECT WATER LINES AT MASTER BATH 3) NAIL PROTECT DWV AT MASTER BATH 4) GAS TEST AT 6 PSI, 10 PSI MINIMUM REQUIRED 5) CHECK FLEX DUCTS FOR TO MUCH COMPRESSION |
|
| 07/23/2004 | FRAMING | Denied | IVRS - Inspection :COMPLY WITH DETAIL GASD3 4SD4 PROVIDE 30" OF WORKSPACE IN FRONT OF FAN CHECK FLEX DUCT FOR TOO MUCH COMPRESSION LOOSE RED HEADS REPLACE GREEN PLATE AT LAUNDRY ROOM |