Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/04/2004 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection :*/ 1) CWV SYSTEM COORECTIONS MADE OK. OK TO COVER CWV. 2) OK TO COVER ALL AREAS. |
| 06/01/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection :*/ 1) ABS DWV CONVENTIONALLY PIPED. OK TO CVOER. NOTE: FITTINGS THAT HAVE RECTOR SEAL #5 TO BE CUT OUT AND REPLACED. 2) CWV SECTION NOT INSTALLED PER CODE MUST ALL BE FLAT FROM POINT OF CONNECTION WITH 2% GRADE. VENT TO BE TAKEN OFF DOWNSTREAM OF LAST FIXTURE. |