Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2004 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
| 05/11/2004 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) CABLE SHEATHING HAS MANY TEARS AND IS NOT PROPERLY REPAIRED PER POST TENSION INSTITUTE STANDARDS 2) NO SPECIAL INSPECTION REPORT ON SITE 3) UFER GROUND MUST BE IN BOTTOM OF TRENCH 3" ABOVE SOIL |