Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/26/2004 | MECHANICAL - FINAL | Approved | IVRS - Inspection :*/ OK FOR C OF O. | |
| 05/25/2004 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) LABEL OR IDENTIFY VAV BOXES. CLIMATIC WILL PROVIDE LABELING. 2) 20 AMP FUSES TOO LARGE FOR VAV BOXES. 15 AMP IS MAX. FINISH CONNECTING POWER TO VAV BOXES. 3) FRAME TRANSFER OPENINGS IN WALL TO PROPER SIZE. RECALL FOR INSPECTION. |