Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/28/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) NOT READY FOR INSPECTION AS PER PLBG CONTRACTOR | |
| 02/28/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1) AIR PRESSURE TEST 5 POUNDS IS OK FOR DWV SYSTEM 2) BLDG SEWER FROM TWO WAY CLEANOUT TO HCS CONNECTION IS OK 3) OK TO BACKFILL TRENCH |
|
| 02/02/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) HAD A PRE CONSTRUCTION MEETING WITH PLBG AND GENERAL CONTRACTOR AND BFL PROJECT MANAGER ON HCS CONNECTION AND FIXTURE UNIT LOAD ON DWV SYSTEM. |