Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/13/2004 | FRAMING | Approved | IVRS - Inspection :* | |
| 08/12/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) HOUSE BEING INSUALTED |
|
| 08/11/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) COMPLY WITH #2 AND #8 |
|
| 08/09/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) EXPOSE LINE 2) RAT RUN AT FLOOR TRUSSES CUT 3) CS STRAP REMOVED 2ND FLOOR TIE TO BEAM AT ENTRY 4) CLEAN WOOD CHIPS IN B-VENT CHASE 5) NAIL PROTECT PLUMBING WITHIN 1 1/2 FROM EDGE AT TOP CHASE 6) BLOCK REGISTER UPSTAIRS 7) REPAIR ARMAFLEX 8) COMPLY WITH FIRESTOP DETAIL 80 AD4 9) HOLDOWN MISSING AT INTERIOR GARAGE WALL |
|
| 08/06/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) NEED PREVIOUS INSPECTION RESULTS |
|
| 07/29/2004 | FRAMING | Denied | IVRS - Inspection : A reinspection fee has been assessed for this inspection. Multiple inspection. No plan/permit on site |
|
| 07/27/2004 | FRAMING | Denied | IVRS - Inspection : A reinspection fee has been assessed for this inspection. Multiple inspection. Rim board in garage not nailed per plan. No plan/permit on site |
|
| 07/26/2004 | FRAMING | Not ready for Inspection | IVRS - Inspection :* | |
| 07/22/2004 | FRAMING | Denied | IVRS - Inspection :Work is not complete enough to inspect.| 950* LATH MISSING NORTH WINDOW HOLE IN LATH SOUTH WALL WATER HEATER VENT REQUIRES 1" TO COMBUSTIBLE MATERIAL REVERSE PITCH ON 2ND FLOOR DRAIN 2ND FLOOR PLUMBING STACK NOT PER PLAN REVISE GARAGE SHEAR WALL MISSING 12 EACH a 35 CLIPS SEAL FIRESTOP 2ND FLOOR PENETRATION ELECTRIC OUTLETS NOT ALLOWED UNDER BAR WITH 6" OR MORE OVERHANG NO GAS TEST SUPPORT GAS LINE AT 10' O.C. NO GAS BOND NAIL PROTECT WIRES WITHIN 1 1/4" OF WALL SURFACE STOPPED INSP |