Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2004 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :*/ 1) SOIL WATER TEST IS OK 2) NOTE: BLDG DRAIN IS STUBBED OUT OF BLDG AT TWO WAY CLEANOUT ONLY 3) 1 1/2" COPPER LOOP FOR BLDG WATEE SUPPLY IS OK 4) OK TO BACKFILL TRENCH | |
| 07/14/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) MUST SLEEVE 4" BLDG DRAIN EXTENDING THRU FOOTER. CAN NOT EMBED ABS WASTE IN CONCRETE. 2) ROUGH PLBG NOT INSTALLED AS PER PLAN. 3) RETEST SYSTEM. 4) REMOVE ANY STONES THAT ARE AROUND SOFT COPPER LOOP. |
|
| 07/13/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* |