Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2004 | ENGINEERING - FINAL | Approved | ALL PREVIOUSLY NOTED COMMENTS HAVE BEEN TRANSFERRED TO THE GRADING PERMIT T01BU01918 | |
| 10/26/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. SEE NOTES 1,3,6,7 & 8 FOR 9-13-04 INSPECTION. PROVIDE A 10' CURB OPENING WITH BOLLARDS AT THE NORTHEAST CORNER OF SITE FOR NOTE #3 LISTED IN PREVIOUS INSPECTION. |
|
| 09/13/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. 1. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T01BU01918 IS COMPLETED AND APPROVED. 2. PROVIDE CURB AT THE NORTHEAST SIDE OF THE SITE AND ADJACENT TO THE TRASH ENCLOSURE. 3. PROVIDE CONCRETE HEADERS AT NORTHEAST AND SOUTH SIDE OF SITE. 4. PROVIDE WATER HARVEST AREAS PER PLAN ON THE NORTHEAST AND SOUTH SIDE OF PROJECT. 5. GRADE SOUTH BASIN PER PLAN DETAILS "C" AND "D". . 6. PROVIDE THE 1:1 GUNITE SLOPES PER EAST BASIN DETAIL "E". 7. GRADE INTERCEPTOR CHANEL TO GROUND ELEVATION OF 40.15 TO EXPOSED 3' LOW FLOW PIPES IN CATCH BASIN. 8. STABILIZE SLOPES AT THE SOUTH AND EAST PERIMETERS OF THE BUILDING. 1:1 SLOPES REQUIRE GROUTED ROCK RIPRAP. 2:1 SLOPES REQUIRE ROCK RIPRAP OVER FILTER FABRIC. 3:1 - 4:1 SLOPES REQUIRE DECOMPOSED GRANITE. 9. PROVIDE ONE-WAY AND RIGHT TURN ONLY SIGNS AT NORTHEAST ENTRANCE. |
|
| 09/03/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T01BU01918 IS COMPLETED AND APPROVED. |