Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2004 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 10/08/2004 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/11)SEPARATE NEUTRAL & GROUND WIRES AT SUBPAREL 2)NEED SEPARATE GROUND AT DETACHED BLDG (FIVE GROUND RODS) 3)FOOTINGS TO BEAR MINIMUM 12" BELOW NATURAL GRADE 4)INSTALL STUDS AT 16" ON CENTER SPACING 5)ELECTRIC PVC CONDUIT TO HAVE 12" OF DIRT COVER OVER TOP OF IT. 6)PLAN CALLS FOR UPGRADE ELECTRIC SERVICE TO 200 AMP (HAVE PLAN UPGRADE DELETED WITH CITY PLAN CHECK) 7)COMPLETE ELECTRIC 8)INSTALL NIPPLE STUD OVER DOOR HEADER UNDER FOOF JOISTS 9)SECURE ELECTRIC WIRES WITHIN 12" OF BOXES. |
|
| 10/04/2004 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) GATE LOCKED, NO ACCESS. RECALL |
|
| 08/09/2004 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) WILL NEED TO EXCAVATE VERTICALLY AT EACH CORNER OF BLDG TO VERIFY DEPTH OF CONCRETE FOUNDATION 2) INCORRECT NAILS USED IN H2.5 CLIPS 3) PLAN CALLS FOR 2" X 8" RAFTERS ON 16" CENTER (24" EXISITING) 4) WILL NEED TO MOVE ALL ITEMS AWAY FROM EXTERIOR WALLS TO VERIFY ELECTRIC AND FRAMING 5) NEW 200 AMP ELECTRIC PANEL NOT INSTALLED YET 6) NEW 100 AMP SUB-PANEL NOT INSTALLED AT STORAGE SHED 7) SECURE ELECTRIC ROMEX WITHIN 12" OF BOXES AND 48" MAXIMUM OF LENGTH OF RUN 8) INSTALL NAIL (BANG PLATE) PROTECTION ALL HOLES DRILLED IN STUDS 9) CANNOT HAVE (ELECTRIC WIRES) ROMEX EXPOSED (MUST BE IN CONDUIT OF WHEN ALL IS APPROVED SHEETROCK MAY BE INSTALLED 10) HEADERS INCORRECTLY INSTALLED OVER DOORS-WINDOWS 11) SOME STUDS NOT ON 16" SPACING 12) STOPPED INSPECTION 13) COMPLETE ALL AND RECALL 14) ALL WORK COMPLETED WITHOUT INSPECTIONS |