Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T04CM01199
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/20/2004 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :*/ APPROVED PLANS ON SITE. | |
04/23/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ | |
04/22/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ WASTE AND VENT THRU ROOF WTR TEST OK. H2O LINE PRESSURE TEST OK. 1) WILL NEED CITY APPROVED PLAN FOR H2O AND WASTE AND VENT PER RED LINE DRAWINGS. 2) NEED LETTER FROM ENGINEER SAYING T/M IS OK IN PLACE OF T/L COPPER PIPE IN STRUCTURE. | |
04/21/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*/ WTR TEST ON WASTE AND VENT THRU ROOF AND H2O PIPING OK PENDING HAVING RED LINE DRAWING ON SITE TO COMPARE TO CITY APPROVED DRAWING OF ACTUAL INSTALLATION OF BOTH H2O SYSTEM AND WASTE AND VENT SYSTEM. 1) PROVIDE MID-STORS SUPPORT AT ALL PIPING. 2) PROVIDE APPROVED CLAMPS FOR SECURING ALL PIPING. 3) PROVIDE STAMPED LETTER FROM ENGINEER OR ARCH. GIVING OK FOR T/M COPPER IN PLACE OF T/L COPPER WHICH ALL EXISTING BLD IS. |