Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T04CM01155

Parcel: 141012020


Addresses:

5330 S CIVANO BL


Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T04CM01155

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
07/01/2004 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
06/29/2004 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
06/24/2004 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*/ MAKE CORRECTIONS.
06/23/2004 PLUMBING - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*/ 1) SEE NOTES FROM 6/21/04 INSP. 2) SECURE ALL PIPING AT APPROPRIATE INTERVALS WITH APPROVED DEVICES AND METHODS. 3) WTR TEST SHALL BE THRU ROOF ON WASTE AND VENT. 4) GAS PIPING TO BE INSTALLED PER APPROVED PLAN WITH MIN. 10 PSI ONLY 5 AT TIME OF INSP. 5) ALL GAS PIPING TO BE 6" MIN. ABOVE FINISHED GRADE. THIS IS NOT A COMPLETE LIST. HAVE YOUR PLBR PRESENT AT TIME OF NEXT INSP.
06/21/2004 PLUMBING - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*/ 1) GAS PRESSURE TEST WAS AT 0 LBS - PROVIDE 10 LBS MIN. 2) CAN NOT HAVE A 2" TRAP ARM FOR LAVATORY. THIS TRAP ARM MUST BE 1½" MAX. ALL THE WAY TO THE BARREL. 3) RETEST SYSTEM LOTS OF AIR IN WTR TEST.