Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
Permit Number - T04CM01149
Inspection Description - EXT METAL CLIPS/EXT SHEATHING
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2004 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 05/11/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) SET ALL NAILS/STAPLES FLUSH WITH ROOF SHEATING 2) ALL ITEMS NOT RESOLVED 3) NO REFEE ASSESSED AT THIS TIME-NEXT TIME |
|
| 05/10/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) HAVE ALL PLAN DESCIPANCIES ADDRESSED WITH CITY OF TUCSON PLAN CHECK 2) HOLDOWNS WRONG LOCATIONS, WRONG EXPOXIED EMBEDMENT PER SPEC. INSPECTION 3) WRONG SIZE POSTS ALL HOLDOWNS 4) POST EXCESSIVELY NOTCHED HOLDOWNS 5) SHEAR WALLS MISSING 6) SHEAR WALL NAILING NOT TO CODE OR PLAN 7) BEAM SADDLES, SPECS NOT ON PLAN 8) NEED APPROVAL ON ONE COAT STUCCO FOR EXTERIOR FIREWALL 9) STOPPED INSPECTION |
|
| 05/07/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) PLAN CALLS FOR 6 X 6 POSTS AND 7 3/4" EMBEDMENT BOLTS ON HD10A EXPOSED 2) SW4 REQUIRES 2"-12" NAILING PATTERN 3) SW2 REQUIRES 1/2" DIAMETER ? BOLTS AT 24" CENTER SPACING 4) NAILS SET TO DEEP-SHOULD BE FLUSH WITH OSB 5) NEED LADDER FOR ROOF INSPECTION 6) STOPPED INSPECTION |
|
| 05/06/2004 | EXT METAL CLIPS/EXT SHEATHING | Not ready for Inspection | IVRS - Inspection :* |