Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2004 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 06/23/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) OSB SHEATHING REQUIRES NAILS AT 6" ON CENTER 2) SPACING AT ALL PANEL EDGES (TOP, BOTTOM AND SIDES) 3) ALSO MUST BE NAILED AT ALL STUDS 12" ON CENTER SPACING 4) 3RD REQUEST, REFEE DUE PRIOR TO NEXT INSPECTION |
|
| 04/30/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 03/31/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection 0999*/ 1) NAIL PER CODE-6" ON EDGES AND 12" IN FIELD |