Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2005 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 06/22/2005 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SAME AS INSPECTION OF 7/21/04 |
|
| 07/21/2004 | BUILDING - FINAL | Denied | IVRS - Inspection :INSTALL FULL SIZE WATER HEATER P&R LINE TO EXTERIOR OF CABINET UNCOVER TO VERIFY ALL ELECTRIC GROUNDS AND BONDS UNCOVER UNDERGROUND ELEC CONDUIT AND SUB PANEL INSTALL SMOKE DETECTORS PER PLAN APPEARS UNIT #2 125 AMP DISCONNECT UNDER SIZED |
|
| 07/19/2004 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 07/14/2004 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) APPEARS ELECTRIC PANEL UNIT #2 125 AMP MAIN IS OVERLOADED WITH 100 MAIN TO UNIT #1 |
|
| 06/14/2004 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) NOT READY PER OWNER REPRESENTATIVE | |
| 06/10/2004 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) ELECTRIC NOT PER APPROVED PLAN 2) CEILING FAN TO LOW 3) GFCI INOPERABLE 4) SEAL AROUND SHOWER AND TOILET BASE 5) INSTALL SMOKE DETECTOR LEADING TO BEDROOMS 6) INSTALL WATER HEATER PTR LINE TO EXTERIOR OF CABINET 7) PAINT EXPOSED VTR'S 8) CHECK ELECTRIC CALC'S, GROUNDING, BOND, ETC... 9) STOPPED INSPECTION 10) SEE WRITE UP ON #1 |
|
| 03/25/2004 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection 0000* |