Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T04CM01049
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/08/2004 | PLUMBING - FINAL | Approved | IVRS - Inspection :*/ 1) 4-IN HOUSE BACKFLOW CERTIFICATIONS 2) 1-EXTERIOR BACKFLOW CERTIFICATIONS | |
07/07/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) DRAINS FROM RP'S TO BE SEPERATE PER REQUIREMENTS FOR INDIRECT DRAINAGE 2) H2O SUPPLYS TO BACKFLOW PREVENTION DEVICES TO BE FULL SIZE PIPING PER 610.2 94 UPC 3) INTERMINGLING OF BRASS AND GALVENIZED PIPING DOES NOT ELIMINATE CORRISION PIPE THESE DEVICES WITH COPPER OR PROVIDE DIELECTRIC PROTECTION 4) PROVIDE APPROVED CLAMPS ON COKE MACHINE DRAINS | |
07/02/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) MAKE CORRECTIONS NOTED ON 7/1/04 2) 10 PSI AIR TEST ON GAS PIPING FOR ? OK 3) GAS CARD AT METER | |
07/01/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) INDIRECT DRAINS SHALL HAVE MIN. 1" AIR GAP AT FLOOR SINKS AND BE RIDGID PIPING FULL SIZE. 2) ALL INDIRECT DRAINS TO BE SEPERATE AND IF OVER 5' IN LENGTH TRAPPED AT APPLIANCE. 3) SEPARATE BACKFLOW PROTECTION IS REQUIRED FOR EACH CARBONATOR AND H20 SUPPLY TO EACH FOUNTAIN MACHINE FOR WTR MIXED WITH ANY OTHER SUBSTANCE. 4) MIN. 10 PSI TEST ON GAS IN PLACE AT TIME OF INSP BECAUSE OF CHANGES TO SYSTEM. 5) CORRECT DRAINAGE AT 3 COMP SINK IN REAR OF BLD. |