Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - SEWER HCS CONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/14/2004 | PLUMBING - SEWER HCS CONNECT | Approved | ||
| 11/10/2004 | PLUMBING - SEWER HCS CONNECT | Partial Approval | 1) 4" SDR 35 TAP INTO 8" SEWER ON SOUTH EAST STUBBED UP ONLY OK 2) WILL NEED VERIFICATION OF GRADE ON THIS SITE SEWER AT LATER DATE |
|
| 10/01/2004 | PLUMBING - SEWER HCS CONNECT | Partial Approval | 1) 3"PVC YARDWATER FROM RPPBP LOCATION ON CONNECTION AT BDLG OK PRESSURE TEST OK TO COVER 2) NEED TO SEE RPPBP INSTALLED AND FINAL CONNECTIONS TO METER 3) SEWER APPROVED. | |
| 07/22/2004 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection :* |