Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/24/2004 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection :*/ CORRECTION MADE WRAP FOR CONCRETE OK. |
| 05/21/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection :*/ 1) WATER TEST ON WASTE AND VENT UNDERGROUND ONLY 2) WILL NEED TO SEE WRAP AND PRIMERS IF REQUIRED PRIOR TO POUR |
| 05/20/2004 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :*/ INSTALL 3" P-TRAP FOR SS-1 FIXTURE. 2" FROM METER TO TWO 1" GUH-1, 2" TO 1¼ RTU ON ROOF, 1½ TO RTU ON ROOF PARTIAL APPROVAL. 12 PSI AIR TEST TO CAPS. THIS WILL REQUIRE TEST AT CONNECTION TO VALVES FOR APPLIANCES. 3" GAS WILL REQUIRE 60 PSI TEST. |