Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 05/11/2004 |
PLUMBING - INTERMEDIATE |
|
Approved |
IVRS - Inspection :*/ 1) PLBR TO MAKE CORRECTIONS AS NOTED. 2) OK TO COVER ALL AREAS. |
| 05/10/2004 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 05/07/2004 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) PLEASE PROVIDE PERMIT FOR NEW GAS LINE 2) WE HAVE TWO SETS OF PLANS ? SPECS CALLS FOR TYPE L COPPER PEX HAS BEEN INSTALLED 3) GAS TO A UNIT ONLY ? 4) TEST ON ABS ONLY AT THIS TIME. DO NOT COVER |
| 05/05/2004 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection :*/ NOT READY FOR INSP. - PLBRS TAPE NOT AN APPROVED STRAP - PIPING TO BE SUPPORTED AT END OF BRANCHES, AT CHANGES OF DIRECTION OR ELEVATION, AND THEN EVERY SO MANY FEET AS REQUIRED BY TABLE 3-1 94 UPC. HORIZONTAL BY HORIZONTAL CHANGE OF DIRECTION ON DRAINAGE PIPING TO BE THROUGH WYE BRANCH OR EQUIVELENT. NOTE: A TRAP ARM MAY NOT CHANGE SIZE, TRAP TO BE SAME SIZE AS TRAP ARM. |
| 05/04/2004 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) DO NOT ROUTE WATER PIPING OVER ELECTRIC SERVICE PANEL 2) WHILE BUNDLING IS ALLOWED WITH PEX PIPE. BUNDLING HOT AND COLD TOGETHER IS NOT APPROVED |