Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/04/2004 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection :* 1) SEE 103.5.4.2 94 UPC 2) NOT TESTED. REINSPECTED WATER TEST OK OK TO COVER. |
| 09/29/2004 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 09/28/2004 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :*/1) CITY FO TUCSON CURRENTLY ENFORCES 1994 UPC W/STATE ADDENDUMS WHICH DOSEN'T REQUIRE YOU TO INSTALL SCREWS IN YOUR PIPE, BUT DOES REQUIRE A FIRE POUND AIR TEST OR A WATER TEST TO TEN FEET. 2)UNABLE TO LOCATE SITE SEWER, OR SITE WATER PLAN. PLEASE HAVE THEM AVAILABLE AT THE NEXT INSPECTION. |