Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2004 | ENGINEERING - FINAL | Approved | C OF O APPROVED. 1. REQUESTED PUNCH LIST ITEMS WERE ADDRESSED. |
|
| 08/24/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O. 1. PROVIDE ERROSION PROTECTION AT THE BASE OF EACH DOWN SPOUT AROUND THE BUILDING. 2. CALL FOR RE-INSPECTION ONCE OUTSIDE LANDSCAPING AND ERROSION PROTECTION IS COMPLETED. |