Permit: T04CM00495

Parcel: 116182570

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
03/19/2004 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection 0000*
03/16/2004 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection 0999*/ 1) PLUMBING CANNOT BE PARALLEL IN FOOTING 2) CMU SUPPORTING STEEL DISPLACES TOO MUCH CONCRETE 3) 1 1/2" CLEARANCE REQUIRED AT STEEL TO WASTE LINES, FORMS 4) 3" MINIMUM CLEARANCE AT STEEL TO SOIL 5) WRAP ALL EXPOSED WASTE (WHERE CONCRETE WILL CONTACT IT) 6) 1/4" PER FOOT SLOPE REQUIRED AT ALL WASTE 7) EXISTING STRUCTURE TO NORTH DOES NOT SHOW ON SITE PLAN. REVISE AND SUBMIT FOR APPROVED 8) NOT THE CARPORT-THE OTHER BLDG