Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/25/2004 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 05/24/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) GABLE END TRUSSES REQUIRE H2.5 CLIPS ON END PER 1/SD3 2) SHEAR BLOCKING PANELS NOT BUILT PER 4/SD4 AND NOT NAILED THROUGH ROOF SHEATHING |
|
| 05/21/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) 7/SD3 NOT COMPLIED WITH 2) CHECK WITH SUPER (BOYD) ON AREAS NEEDING TO BE NAILED ROOF 3) OVERSPAN EAST WALL |
|
| 05/20/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) OVERSPANS STILL EXIST 2) OVER NOTCHED EXTERIOR STUD 3) PROVIDE ACCESS TO ROOF 4) NEXT FAILURE WILL BE DOUBLE RE-FEE |
|
| 05/19/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : A reinspection fee has been assessed for this inspection. Multiple inspection. Provide access to roof. Nothing done from last inspection |
|
| 05/18/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) PATIO ROOF NOT NAILED 2) TWO 2 INCH STRIPS OF OSB MISSING 3) OVERSPANS EAST WALL, WEST WALLS 4) NAIL FRONT BACK SIDE OF ROOF 5) NAIL RIDGE 6) COMPLY WIEH DETAIL 7/SD3 REAR 7) COMPLY WITH DETAILS 10 AND 11/SD4 |
|
| 05/17/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) ROOFERS REMOVING DRY IN |
|
| 05/13/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) CHECK FOR OVER SPANS 2) BACK PATIO ROOF NOT NAILED 3) ROOF DRYED IN BEFORE INSPECTION, EXPOSE SHEATHING |
|
| 05/03/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) OVERSPANS EAST WALLS, WEST WALLS AND SOUTH 2) SHEAR AT REAR OF HOUSE INTERIOR AND EXTERIOR NOT PER PLAN 3) BACK PATIO NOT FRAMED 4) EDGE NAILS NOT NAILED TO BLOCKS 5) SHEAR PANELS NOT BLOCKED 6) STOPPED INSP. RECALL WHEN READY. TOO MANY ITEMS |