Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T04CM00341
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/18/2006 | ENGINEERING - FINAL | Approved | Fianl grading inspection approved | |
10/25/2006 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O EXTENSION. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR PERMIT T04BU00946 IS COMPLETED AND APPROVED. SEE ATTACHED FINAL GRADING PUNCHLIST FOR THIS SITE. 1. CONSTRUCT SITE TO THE GRADING PLAN SPECIFICATIONS OR SUBMIT A REVISED GRADING PLAN TO THE CITY OF TUCSON, DEVELOPMENT SERVICES ENGINEERING AND ZONING DIVISIONS, FOR REVIEW AND APPROVAL. SEE GENERAL NOTE #13 OF THE GRADING PLAN, PAGE 1. THE GRADING PLAN SHOULD MATCH THE DEVELOPMENT PLAN. 2. THE NORTHWEST QUADRANT OF THIS SITE IS NOT GRADED TO THE ELEVATIONS SHOWN ON THE GRADING PLAN. 3. REMOVE THE STOCKPILE OF MATERIAL LOCATED ON THE NORTHWEST QUADRANT.OF THIS SITE. 4. REPAIR EROSION DAMAGE TO THE SOUTHERN BANKS OF RETENTION BASINS 11 AND 12, AND REMOVE SEDIMENT DEPOSITED IN THESE BASINS. 5. PROVIDE A SUBSTANTIAL BARRICADE ACROSS THE DRIVEWAY AT WETMORE RD. BETWEEN BASINS 11 AND 12, TO PREVENT ACCESS.TO THE UNDEVELOPED LOT AND TO PROTECT THE HYDROSEEDED AREA 6. PROVIDE FILTER FABRIC UNDER ROCK RIP RAP AT ROOF DRAINAGE OUTLETS AT WEST SIDE OF JARED BUILDING. 7. PROVIDE STRIPING FOR (3) PARALLEL PARKING SPACES IN FRONT OF CIRCUIT CITY AND, (3) AT NORTH SIDE OF CIRCUIT CITY BUILDING. 8. SHOW CORRECT CONFIGURATION OF PATIO AT SOUTHWEST CORNER OF LOT #6, ON THE REVISED GRADING PLAN. 9. COMPLETE CONSTRUCTION OF ALL PEDESTRIAN CIRCULATION ROUTES, INCLUDING CROSSWALKS AT DRIVEWAYS, AND PROVIDE SIDEWALKS AT LOTS 2 AND 5. 10. PROVIDE CLARIFICATION ON THE REVISED PLANS THAT INDICATES THE TYPE OF CROSSWALKS (PAINTED STRIPES OR DECORATIVE CONCRETE) AT DRIVEWAYS AND BETWEEN LOTS. 11. PROVIDE CROSSWALK BETWEEN LOTS 3 AND 4. 12. PROVIDE AT MINIMUM A 4' SIDEWALK AT THE SOUTHWEST CORNER OF BUILDING #7. 13. PROVIDE A TRASH ENCLOSURE FOR (2) TRASH CONTAINERS AT BUILDING #7. 14. REPAIR EROSION DAMAGE NORTH OF BUILDING #7 WHERE ROOF DRAINS DISCHARGE ACROSS PUBLIC SIDEWALK. 15. PROVIDE BOLLARDS ON SIDEWALLS OF TRASH ENCLOSURE AT SOUTHEAST CORNER OF BUILDING #8. 16. PROVIDE TRASH ENCLOSURE WALLS AT EAST SIDE OF BUILDING #10 (ULTA BLDG). 17. PROVIDE SCREEN WALL FOR NORTH END OF TRASH COMPACTOR AT REAR OF CIRCUIT CITY BUILDING. 18. CONSTRUCT HANDICAP RAMP AND SIDEWALK AT THE NORTHWEST CORNER OF THE WALGREENS LOT AS SHOWN ON THE GRADING PLAN; THE VERTICAL CURB ON THE NORTHWEST CORNER OF THIS RAMP IS A TRIP HAZARD. 19. SHOW THE CHANNEL EXTENSION AT THE NORTH END OF BASIN #7 ON THE REVISED GRADING PLAN. 20. PROVIDE ALL BICYCLE PARKING SPACES AT THIS SITE AS SHOWN ON THE PLAN. 21. PATCH ASPHALT TO GRADE AT LOCATIONS WHERE IRRIGATION SLEEVES HAVE BEEN INSTALLED. 22. CORRECT STANDING WATER AT ROCK RIP RAP INLET TO BASIN#5 AND AT INLET TO BASIN #1 WHERE GARDEN CENTER DISCHARGE PIPE IS LOCATED. 23. REPAIR BROKEN SIDEWALK AT ENTRANCE DRIVE SOUTHEAST OF BLDG. #2. 24. GROUT AROUND BLEED PIPES THAT DISCHARGE INTO THE CATCH BASIN ON ORACLE ROAD AT RETENTION/DETENTION BASIN #9. 25. PROVIDE SLOPE PROTECTION AT NORTH END OF RETENTION/DETENTION BASIN #3 WHERE SLOPES ARE STEEPER THAN 3:1. 1:1 SLOPES REQUIRE GROUTED ROCK RIP RAP, AND 2;1 SLOPES REQUIRE ROCK RIP RAP ON FILTER FABRIC. 26. PROVIDE A 6" PVC PIPE FROM DOCK DRAIN BEHIND PETSMART TO RETENTION/DETENTION BASIN #3 AS SHOWN ON THE PLAN. 27. SHOW THE STORM DRAIN SUMP AT THE SOUTHEAST CORNER OF HOME DEPOT ON THE REVISED PLANS. 28. SHOW THE CORRECT PLACEMENT, SIZE, AND CFS FOR THE WALL OPENINGS AND INLET STRUCTURES FOR RETENTION/DETENTION BASINS 1,2, AND 3 ON THE REVISED PLANS. ALSO CORRECT DETAIL C, PAGE 7 OF THE GRADING PLAN 29. PROVIDE 25' WEIR OVERFLOWS FOR BASINS 1 AND 2. SEE DETAIL B, PAGE 7. 30. CORRECT PONDING WATER ON ASPHALT DRIVEWAYS AND PARKING SURFACES AT ALL PEDESTRIAN/HANDICAP ACCESS ROUTES, AND AT TRASH ENCLOSURES. INSPECTOR WILL MEET WITH SITE SUPERINTENDENT TO ADDRESS MULTIPLE LOCATIONS OF PONDING WATER. |
|
10/18/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. 1. MAINTAIN ALL BARRICADING WHERE ON-GOING CONSTRUCTION ACTIVITY IS OCCURRING TO PREVENT PUBLIC ACCESS. 2. PROVIDE BICYCLE PARKING PER PLAN. 3. CONSTRUCT TRASH COMPACTOR SCREEN WALL. 4. PROVIDE A C.O.T. APPROVED DEVELOPMENT PLAN THAT MATCHES THE GRADING PLAN THAT SHOWS ALL MODIFICATIONS. |
|
10/14/2005 | ENGINEERING - FINAL | Partial Approval | SEE COMMENTS FOR 10/03/05 INSPECTION AND CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. | |
10/03/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED FOR STOCKING PURPOSES ONLY. 1. BARRICADE ALL AREAS WHERE ON-GOING CONSTRUCTION ACTIVITY IS OCCURRING TO PREVENT PUBLIC ACCESS. 2. COMPLETE CROSSWALK STRIPING OR CONCRETE WORK. 3. PROVIDE BICYCLE PARKING PER PLAN. 4. CONSTRUCT THE TRASH COMPACTOR SCREEN WALL. 5. PROVIDE A C.O.T APPROVED DEVELOPMENT PLAN THAT MATCHES THE GRADING PLAN. SHOW ALL MODIFICATIONS. 6. CALL FOR INSPECTION BEFORE PUBLIC OPENING OF BLDG. |
|
09/30/2005 | ENGINEERING - FINAL | Denied | NOT READY FOR INSPECTION 1. COMPLETE ALL SITE WORK 2. STRIPE THE PARKING AREA 3. COMPLETE SITE ACCESS ROUTES 4. COMPLETE ALL SITE WORK 5. BARRICADE ALL AREAS WHERE ON-GOING CONSTRUCTION ACTIVITY IS OCCURING TO PREVENT PUBLIC ACCESS. |