Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 12/13/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :* 1) CONTRACTOR TO CORRECT ? PITCHED SECTIONOF VENT AND STRAP ALL OVERHEAD PIPING PER TABLE 3-1 GUAGE 2) USE SS OR GRASS SCREWS ON CLOSET FLANGES 3) OK TO COVER ALL AREAS |
| 12/09/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :*/GAS LINE. SEE SPEC WE DO NOT MIX & MATCH BLACK PIPE & CSST. PLEASE INSTALL AS PER APPROVED PLAN OR PROVIDE AN APPROVED REVIDED PLAN. IF CSST GAS LINE IS APPROVED - HAVE PLUMBER PROVIDE INSTALLATION BOOK ON JOB AT TIME OF INSP. PLEASE HAVE PLUMBER ANCHOR 3/4 DROP AT FURNAACE |
| 12/03/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :* |