Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2004 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
| 06/17/2004 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) FOUNDATION FOOTING MUST BE 19" WIDE AND 12" BELOW NATURAL GRADE PRESENTLY 16" WIDE AND 7" BELOW GRADE 2) CLAY SEWER PIPE NOT ALLOWED UNDER BLDG-MUST BE REPLACED 3) 10' WATER TEST REQUIRED ON PLUMBING AFTER REPLACED 4) ALL PLUMBING THAT MAY CONTACT MUST BE WRAPPED OR SLEEVED 5) A TWO WAY CLEANOUT REQUIRED ON SEWER. PLEASE FOLLOW THE PLAN |