Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2004 | ENGINEERING - FINAL | Approved | ||
| 05/19/2004 | ENGINEERING - FINAL | Denied | 1. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 2. SWEEP ASPHALT DRIVES AND PARKING AREAS. 3. REMOVE ALL SEDIMENT AND DEBRIS FROM STORMWATER CATCH BASIN. 4. PROVIDE SANDBAG INLET SEDIMENT CONTROL AT THE CATCH BASIN ON THE SOUTHWEST CORNER UNTIL ALL UPSTREAM PAVEMENT AND CONSTRUCTION IS COMPLETE. |