Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 02/07/2007 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
|
| 01/06/2006 |
ENGINEERING PRE-CONSTRUCTION |
|
Partial Approval |
PAUL MACHADO AND I MET WITH CONTRACTOR, OWNER, ENGINEER AND ARCHITECT REGARDING CHANGES AND VALUE ENGINEERING. |
| 01/05/2006 |
ENGINEERING PRE-CONSTRUCTION |
|
Partial Approval |
MET WITH THE ENGINEER AND STREET DIV. INSPECTOR REGARDING CHANGES TO PLANS AND TREES IN R.O.W. |
| 01/03/2006 |
ENGINEERING PRE-CONSTRUCTION |
|
Partial Approval |
SITE GRADING IN PROGRESS FOR APPROXIMATELY 1 MONTH. I MET WITH ERNIE TORRES (240-4478) OF DIVERSIFIED CONST. |