Permit: T04BU03058

Parcel: 141090630


Addresses:

7600 S KOLB RD


Inspection Status: Partial Approval

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T04BU03058

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Partial Approval

Date Description Inspector Results Comments
06/07/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
01/03/2007 STORMWATER FOLLOW-UP INSP Partial Approval SPOKE TO NOAH WITH BORDERLAND
SECOND PHASE...TO BEING IN '07
07/11/2006 STORMWATER FOLLOW-UP INSP Partial Approval TRESSPASSERS ON LOS REALES ROAD
WAITED FOR MARC TO ACCOMPANY ME

SEDIMENT CONTROLS APPEAR TO BE WORKING-SITE STABLIZATION MEASURES SEEM TO BE WORKING
04/25/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IS IN GOOD SHAPE
BARRICADES HAVE BEEN PLACED MAKING ACCESS FROM THE EAST SIDE OF SITE IMPASSIBLE
03/13/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IN GOOD SHAPE
HYDROSEED INTACT
ONE LOCATION ON EAST END OF NEW DRAINAGE HAS EROSION
HAY BALE CHECK DAM APPEARS TO BE WORKING ON WEST END
ONE LOCATION OF EROSION/SINK HOLES ON WEST END
02/23/2006 STORMWATER FOLLOW-UP INSP Partial Approval DRAINAGEWAY IS NOT DETAILED ON DSD PLANS
MAY BE PART OF PIA NEED TO CONTACT TRANSPORTATION
ALL DISTURBED AREAS ADJACENT TO DRAINAGEWAY HAVE BEEN HYDROSEEDED
NORTH BASINS ARE IN PLACE-NEED PLANS TO VERIFY CONSTRUCTION
01/25/2006 STORMWATER FOLLOW-UP INSP Partial Approval WORK IS ON GOING

NEW DRAINAGEWAY HAS ROCK GABIONS AT EAST AND WEST ENDS. TIE IN SHOULD BE COMPLETE
12/16/2005 STORMWATER FOLLOW-UP INSP Partial Approval - TOW DOWN INSTALLE AND PROTECTED WITH 2 ROWS OF STRAWBALES
- GABIONS INSTALLED @ WEST SIDE
- S.C.E. IN GOOD SHAPE AND APPEARS TO BE WORKING
- BARRIER RAILING PARTIALLY INSTALLED ALONG NEW DRAINAGE
- SOME HYDROSEEDING DONE
11/09/2005 STORMWATER FOLLOW-UP INSP Partial Approval MET WITH MIKE BOWER 405-5613 DISCUSSED THIS PROJECT AND ADDITIONAL GRADING PERMIT T04BU03059. STRAW BALES HAVE BEEN REMOVED FROM WEST SIDE OF WASH WHILE HILLSIDE EXCAVATES FOR TOWDOWN FOR CONNECTION OF THE NEW DRAINAGE WAY. PER MIKE STRAW BALES WILL BE REINSTALLED AS WORK IS COMPLETED. SILT FENCE IS NOT IN PLACE ALONG NORTH SIDE OF THE PROJECT AT THIS TIME. THERE IS A V DITCH IN IT'S PLACE AND A SILT FENCE WILL BE INSTALLED ALONG ENTIRE NORTH SIDE OF PROJECT BEFORE DRAINAGEWAY IS TIED IN. WORK TO START ON T05BU03059 SOMETIME IN MARCH.
09/16/2005 STORMWATER FOLLOW-UP INSP Correction Required SPOKE WITH MIKE BOWER, SITE SUPERVISOR, ABOUT SECURING AREA WHERE NEW CHANNEL MEETS THE JULIAN WASH ON THE NORTHWEST SIDE OF THE SITE. MIKE SAID REPAIRS WOULD BE COMPLETED BY AFTERNOON MONDAY. SILT THAT REACHED THE WASH THROUGH THE NEW CHANNEL WILL HAVE TO BE REMOVED.
08/08/2005 STORMWATER FOLLOW-UP INSP Correction Required NO ONE ON SITE. CONCERNED ABOUT STOCKPILES AT THE MOUTH OF NEW CHANNEL WHERE IT CONNECTS TO JULIAN WASH NEAR WILMOT. WOULD LIKE THEM TO BE REMOVED OR STABALIZED. WILL TRY TO CONTACT MIKE BOWER.
07/18/2005 STORMWATER FOLLOW-UP INSP Partial Approval CONSTRUCTION PROGRESS IN SITE IS CONTINUING TO MOVE DIRT AT THIS TIME AND CONSTRUCT THE NEW FLOW PATH FOR JULIAN WASH. NO STORM WATER CONCERNS AT THIS TIME.
06/06/2005 STORMWATER FOLLOW-UP INSP Partial Approval Site is in good shape with no storm water concerns at this time. Site is actively shaping the grade for the new flow path of Julian Wash. Rough grade of the site has occured only.