Inspection History Details
Inspection Status: Partial Approval
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T04BU03058
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Partial Approval
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/07/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME | |
01/03/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | SPOKE TO NOAH WITH BORDERLAND SECOND PHASE...TO BEING IN '07 |
|
07/11/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | TRESSPASSERS ON LOS REALES ROAD WAITED FOR MARC TO ACCOMPANY ME SEDIMENT CONTROLS APPEAR TO BE WORKING-SITE STABLIZATION MEASURES SEEM TO BE WORKING |
|
04/25/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE IS IN GOOD SHAPE BARRICADES HAVE BEEN PLACED MAKING ACCESS FROM THE EAST SIDE OF SITE IMPASSIBLE |
|
03/13/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE IN GOOD SHAPE HYDROSEED INTACT ONE LOCATION ON EAST END OF NEW DRAINAGE HAS EROSION HAY BALE CHECK DAM APPEARS TO BE WORKING ON WEST END ONE LOCATION OF EROSION/SINK HOLES ON WEST END |
|
02/23/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | DRAINAGEWAY IS NOT DETAILED ON DSD PLANS MAY BE PART OF PIA NEED TO CONTACT TRANSPORTATION ALL DISTURBED AREAS ADJACENT TO DRAINAGEWAY HAVE BEEN HYDROSEEDED NORTH BASINS ARE IN PLACE-NEED PLANS TO VERIFY CONSTRUCTION |
|
01/25/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | WORK IS ON GOING NEW DRAINAGEWAY HAS ROCK GABIONS AT EAST AND WEST ENDS. TIE IN SHOULD BE COMPLETE |
|
12/16/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | - TOW DOWN INSTALLE AND PROTECTED WITH 2 ROWS OF STRAWBALES - GABIONS INSTALLED @ WEST SIDE - S.C.E. IN GOOD SHAPE AND APPEARS TO BE WORKING - BARRIER RAILING PARTIALLY INSTALLED ALONG NEW DRAINAGE - SOME HYDROSEEDING DONE |
|
11/09/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | MET WITH MIKE BOWER 405-5613 DISCUSSED THIS PROJECT AND ADDITIONAL GRADING PERMIT T04BU03059. STRAW BALES HAVE BEEN REMOVED FROM WEST SIDE OF WASH WHILE HILLSIDE EXCAVATES FOR TOWDOWN FOR CONNECTION OF THE NEW DRAINAGE WAY. PER MIKE STRAW BALES WILL BE REINSTALLED AS WORK IS COMPLETED. SILT FENCE IS NOT IN PLACE ALONG NORTH SIDE OF THE PROJECT AT THIS TIME. THERE IS A V DITCH IN IT'S PLACE AND A SILT FENCE WILL BE INSTALLED ALONG ENTIRE NORTH SIDE OF PROJECT BEFORE DRAINAGEWAY IS TIED IN. WORK TO START ON T05BU03059 SOMETIME IN MARCH. | |
09/16/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | SPOKE WITH MIKE BOWER, SITE SUPERVISOR, ABOUT SECURING AREA WHERE NEW CHANNEL MEETS THE JULIAN WASH ON THE NORTHWEST SIDE OF THE SITE. MIKE SAID REPAIRS WOULD BE COMPLETED BY AFTERNOON MONDAY. SILT THAT REACHED THE WASH THROUGH THE NEW CHANNEL WILL HAVE TO BE REMOVED. | |
08/08/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | NO ONE ON SITE. CONCERNED ABOUT STOCKPILES AT THE MOUTH OF NEW CHANNEL WHERE IT CONNECTS TO JULIAN WASH NEAR WILMOT. WOULD LIKE THEM TO BE REMOVED OR STABALIZED. WILL TRY TO CONTACT MIKE BOWER. | |
07/18/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | CONSTRUCTION PROGRESS IN SITE IS CONTINUING TO MOVE DIRT AT THIS TIME AND CONSTRUCT THE NEW FLOW PATH FOR JULIAN WASH. NO STORM WATER CONCERNS AT THIS TIME. | |
06/06/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Site is in good shape with no storm water concerns at this time. Site is actively shaping the grade for the new flow path of Julian Wash. Rough grade of the site has occured only. |