Inspection Status: Approved
Inspection History: STORMWATER FINAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 05/20/2011 |
STORMWATER FINAL INSPECTION |
|
Approved |
THE STORMWATER CONTROLS HAVE BEEN REMOVED FROM THE AREAS EXCEPT FOR AROUND THE DETENTION/RETENTION BASIN WHICH WILL BE REMOVED ONCE THE SITE IS COMPLETED BY THE DEVELOPER. ALL OF THE REMAINING WORK HAS BEEN BONDED AND WILL BE RE-INSPECTED UNDER THE SUBDIVISION #S04-102. |
| 12/17/2010 |
STORMWATER FINAL INSPECTION |
|
Continued |
THIS INSPECTION WILL NOT BE COMPLETED UNTILL ALL OF THE WORK IS EITHER COMPLETE OR THE SITE IS FULLY STABALIZED AS RECOMMENDED AND APPROVED BY THE ENGINEERING AND LANDSCAPING DEPARTMENTS. |
| 10/06/2010 |
STORMWATER FINAL INSPECTION |
|
Continued |
SEE MIKES PREVIOUS COMMENT AND MAKE THE NECESSARY MODIFICATIONS PRIOR TO SCHEDULING THE FINAL GRADING INSPECTION. |
| 12/09/2008 |
STORMWATER FINAL INSPECTION |
|
Correction Required |
STABILIZE UN-DEVELOPED/REMAINING LOTS PRIOR TO FINAL GRADING APPROVAL |