Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T04BU03017
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/06/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
05/16/2005 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | SITE IS IN FAIRLY GOOD CONDITION AND HAS NO MAJOR STORM WATER CONCERNS AT THIS TIME. ROUGH GRADE HAS BEEN CONSTRUCTED AND NOW IN THE PROCESS OF BUILDING THE STEM WALLS AND INSTALLING THE PLUMBING FOR THE NEW MCDONALDS RESTERAUNT | |
04/25/2005 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | SITE HAS PERIMETER CHAIN-LINK FENCING INSTALLED AND STABILIZED CONSTRUCTION ENTRANCE. AZPDES POSTING STILL NEEDS TO BE ADDRESSED. SITE IS SCHEDULED TO HAVE THE EXISTING GRADE CUT DOWN TO MEET FINAL GRADE. EXISTING CURB HAS BEEN REMOVED FROM THE PERIMETER. THE SITE DOES DOES NOT REQUIRE ANY PERIMETER CONTROLS PER PLAN HOWEVER IS BEING OBSERVED FOR ANY SEDIMENT TRAVEL OFF SITE AND WILL BE ADDRESSED WITH THE CONTRACTOR IMMEDIATELY. | |
04/20/2005 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | MET WITH RANDY FROM DAMITIO CONSTRUCTION. DISCUSSED THE PRE-CONSTRUCTION REQUIREMENTS AND ALL PERTANENT SWPPP CONTROLS INCLUDING STABILIZED CONSTRUCTION ENTRANCE, NPDES POSTING REQUIREMENTS, STRAW WADDLE INSTALLED FOR STORM WATER RUN-OFF. RANDY PROVIDED A NAME AND NUMBER WITH BEST PAVING AND A RE-INSPECTION WILL BE SCHEDULED FOR MONDAY THE 25TH. | |
03/04/2005 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | NOT READY TO INSPECT, NO ACTIVITY AT THIS TIME |