Permit: T04BU03002


Addresses:

7681 E 22ND ST


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T04BU03002

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
01/07/2009 STORMWATER FOLLOW-UP INSP Approved PROJECT IS READY TO CLOSE OUT
10/31/2007 STORMWATER FOLLOW-UP INSP Correction Required STREETS NEED TO BE SWEPT
09/26/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO OUTSTANDING STORMWATER CONCERNS AT THIS TIME.
ALL PREVIOUS ITEMS HAVE BEEN ADDRESSED/CORRECTED.
09/06/2007 STORMWATER FOLLOW-UP INSP Partial Approval NEW BMPS APPEAR TO BE WORKING BETTER
08/07/2007 STORMWATER FOLLOW-UP INSP Correction Required PICS FILES 1-9
-SWEEP STREETS
-PERFORM MAINTENANCE ON CONTROLS
-ADDRESS EROSION
-REMOVE SEDIMENT FROM STREET

TALKED TO BOB MOLLORY WITH SWPPP MAINT SVCS
07/25/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 3 DAYS

RESET SEDIMENT CONTROLS AT ALL SCUPPER LOCATIONS
REMOVE SEDIMENT FROM STREETS
PLACE CURBSIDE BMPS
CLEAN UP ALL TRACK OUT
ADDRESS EROSION AT E SIDE OF SITE AT OUTFALLS
PERFORM MAINTENANCE ON BMPS AT OUTFALL LOCATIONS
06/08/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 10 DAYS
-LOT 116 MOVE SAND BEHIND CURB
-SWEEP STREET: SAGUARO OVERLOOK, PANTANO OVERLOOK AND OCOTILLO OVERLOOK
05/14/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
04/26/2007 STORMWATER FOLLOW-UP INSP Partial Approval CORRECTIONS HAVE AL BEEN MADE FROM LAST INSPECTION

NO CONCERNS AT THIS TIME
04/18/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 5 DAYS

SEE PICS 2159-2162

-WASHOUT IN STREET IN FRONT OF LOT 99 AND EAST
-CURBSIDE BMPS NEED TO BE IN PLACE AT ALL ACTIVE LOTS
-SWEEP STREETS
04/02/2007 STORMWATER FOLLOW-UP INSP Correction Required SITE NEEDS TO BE SWEPT AND CURB SIDE BMPS DRESSED UP
03/08/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
SITE IN GOOD CONDITION
MET WITH RICHARD LOPEZ (SWPPP MAINT SVC) ON SITE
01/19/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 10 DAYS
-REMOVE SEDIMENT FROM STREET W END OF MESQUITE OVERLOOK
-CLEAN UP DEBRIS S OF LOT 39
-LOT 58, 38, 37,35 UNCONTAINED DEBRIS
-SEDIMENT IN STREET LOT 34/35 (LANDSCAPING)
12/05/2006 STORMWATER FOLLOW-UP INSP Correction Required V DITCHES IN PLACE BEHIND CURB ALL INACTIVE LOTS
EAST SLOPE SPRAYED W/ STRAW (HYDROSEED?)
LOT 56 NO BMP IN PLACE FOR STUCCO MIXER
LTO 54 STUCCO WASHED OUT IN FRONT OF LOT
TALKED TO TONY WITH SWPPP MAINT SVCS
10/18/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 7 DAYS

-SWEEP STREETS
-REMOVE ALL CONSTRUCTION DEBRIS
-CLEAN UP ALL STUCCO/DRYWALL WASH OUT

FAXED TO SWPPP MAINT SVCS
10/05/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 10 DAYS
-SWEEP SOUTHMOST E/W STREET
-MAINTAIN CONTROLS/PLACE CONTROLS IN ROW ON 22ND ST
-CLEAN OUT DRAINAGEWAY N & E OF MODELS-RE-EVALULATE AND ESTABLISH EROSION CONTROLS N OF DRAINAGEWAY OR STABILIZE SLOPE
-CURBSIDE CONTROLS NEED TO BE PLACED LOT 94 EAST, LOT 75 EAST, LOT 13 NORTH, LOT 54
-SWEEP EAST OF 7592
-PLACE CONTROLS AT LOT 49/48 EAST SIDE
-REMOVE DEBRIS W OF NE DRAINAGWAY E OF LOT 24
08/24/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 10 DAYS TO CORRECT
-MAINTAIN WATTLE AT SE CORNER (R.O.W.)
-ADDRESS EROSOIN ON EAST SIDE OF SITE (POSSIBLY PLACE PERMANENT CONTROLS/STABILIZATION)
08/11/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 7 DAYS
-STOCKPILE LOT 19 NOT PROTECTED
-LOT 20/21 CONSTRUCTION DEBRIS NOT IN DUMPSTER
-LOT 22/23 SAND STOCKPILED NO CONTROLS
-SWEEP AT LOT 30/29 TRACKOUT
-LOTS 31-34 NEED SEDIMENT CONTROLS
-LOT 49-57 SWEEP ALL DIRT BEHIND CURB/PLACE CONTROLS
-SWEEP ALL STREETS WITH ACTIVE CONSTRUCTION

TALKED TO PENELOPE ON SITE
07/28/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. EROSION AT NE CORNER OF PROJECT AT DRAINAGEWAY
2. RESET FILTER BAGS AT SCUPPER NE CORNER OF PROJECT
3. SWEEP STREETS
4. RESET FILTER BAGS AT SCUPPER NORTH OF MODELS
5. MORTAR DUMPED/WASHED OUT ON LOT #9
6. EROSION INTO RIP RAP DRAINAGE NORTH OF MODELS
7. CONSTRUCTION DEBRIS AT CONCRETE WASHOUT
8. DEBRIS/GARBAGE AT NORTH PROPERTY LINE
06/01/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. SITE NEEDS TO BE SWEPT ESPECIALLY AT NEW SLAB LOTS
2. PROTECT SCUPPERS WITH SEDIMENT CONTROLS
3. CLEAN UP CONCRETE WASHED OUT NEXT TO NEW RAMP LOCATIONS

NO REVISED GRADING PLAN ONSITE
05/23/2006 STORMWATER FOLLOW-UP INSP Correction Required ADVISED BRUNO THAT STREETS NEED TO BE SWEPT
05/22/2006 STORMWATER FOLLOW-UP INSP Correction Required MET ON SITE WITH PIA INSPECTOR MARTIN 260-9109

CONCERNS ON CURRENT PAD HEIGHTS AND WHERE IT WILL BE IN RELATION TO SIDEWALK-MARTIN IS CONCERNED ABOUT STABILIZATION AND PREVENTING EROSION ONTO SIDEWALK

MET WITH BRUNO 907-6021 WITH KB HOMES. I HAVE A FOLLOW UP MEETING FOR 5/23
04/28/2006 STORMWATER FOLLOW-UP INSP Correction Required PROTECT OUTFALL(S) ON EAST SIDE OF PROJECT NORTH OF MODELS
04/04/2006 STORMWATER FOLLOW-UP INSP Correction Required CONCRETE WASH OUT IS GETTING FULL
ISSUES FROM LAST INSPECTION NOT ADDRESSED
1. STREET IN FRONT OF MODELS NEEDS TO BE SWEPT
2. CONCRETE WASH OUTS EACH ABOUT 1/3 FULL
3. CLEAN-UP OF PREVIOUS EROSION ON NORTH SIDE OF PROJECT SATISFACTORILY COMPLETE (SPOKE TO BOB MOLLORY ABOUT THIS ISSUE)
4. EROSION POINT AT APARTMENT PROPERTY NOT ADDRESSED (NW CORNER OF PROJECT)
5. SWEEP UP ROCK IN R.O.W. AND IN CURB AREA ALONG 22ND
03/30/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. STREET IN FRONT OF MODELS NEEDS TO BE SWEPT
2. CONCRETE WASH OUTS EACH ABOUT 1/3 FULL
3. CLEAN-UP OF PREVIOUS EROSION ON NORTH SIDE OF PROJECT SATISFACTORILY COMPLETE
4. EROSION POINT AT APARTMENT PROPERTY NOT ADDRESSED (NW CORNER OF PROJECT)
5. SWEEP UP ROCK IN R.O.W. AND IN CURB AREA ALONG 22ND
03/21/2006 STORMWATER FOLLOW-UP INSP Correction Required SWEEP TRACK OUT ROCK OUT OF ROW
CLEAN UP EROSION INOT APARTMENT COMPLEX TO THE NORTH OF THE PROJECT-PICTURES GIVEN WITH INSPECTION
03/20/2006 STORMWATER FOLLOW-UP INSP Correction Required TOOK PICTURES OF EROSION FROM SITE INTO APARTMENT COMPLEX TO THE NORTH OF THE NEW CONSTRUCTION
03/14/2006 STORMWATER FOLLOW-UP INSP Partial Approval WATTLE AT SALES ENTRANCE ALONG WEST SIDE NEEDS TO BE REPLACED
SITE IN GOOD CONDITION
NORTH END HAS BEEN STABILIZED
DRY UTILIES ARE BEING INSTALLED NOW
03/10/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IN GOOD CONDITION-MOSTLY STABLE
UTILITIES STILL BEING INSTALLED
MODELS OPEN AND ROADWAY PAVED FOR CUSTOMER ACCESS
REVISION ON GRADING PLAN??
02/21/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IN GOOD CONDITION
SOME EROSION BELOW WATTLE ON HILL SE SIDE OF PROJECT
01/26/2006 STORMWATER FOLLOW-UP INSP Partial Approval SEDIMENT CONTROLS IN PLACE AND APPEAR TO BE WORKING
DRY UTILS BEING INSTALLED
PARTIALLY PAVED(IN FRONT OF MODELS)
01/24/2006 STORMWATER FOLLOW-UP INSP Partial Approval ROCK RIP RAP HAS BEEN PLACED AT NORTH SIDE OF PROJECT WHERE SLOPE HAD BEEN PREVIOUSLY PROTECTED FOR SEDIMENT BY GRAVEL FILTER BAGS.
01/04/2006 STORMWATER FOLLOW-UP INSP Partial Approval -MY SUGGESTION REMAINS TO PLACE SILT FENCE ALONG THE THE SOUTH SIDE OF CHAIN LINK FENCE ALONG THE NORTH SIDE OF THE PROJECT. =IF NOT, PLEASE INSPECT FILTER BAGS AND ENSURE THEY OVERLAP AND WILL FUNCTION TO PREVENT SEDIMENT FROM ENTERING THE APARTMENT PROPERTY TO THE NORTH.
-CONCRETE WASH OUT MUST BE USED- WASH OUT ON NE CORNER NEAR STOCKPILE
12/13/2005 STORMWATER FOLLOW-UP INSP Correction Required 1. CK AND REPAIR FILTER BAGS ON N. SIDE OF CHAINLINK FENCE AND CLEAN UP OVERFLOW FROM PROJECT IN PARKING LOT
2. ENSURE NO ROCK FROM S.C.E. IS ON 22ND OR IN C.O.T. R.O.W. (SIDEWALK)
LEFT MESSAGE FOR BOB MOLLORY AND FOR RICHARD LOPEZ
12/01/2005 STORMWATER FOLLOW-UP INSP Partial Approval 1. SILT FENCE ALONG SOUTH SIDE OF PROJECT NEEDS TO BE RE-ESTABLISHED
2. ENSURE SWEEPING AT S.C.E. NO ROCK ON 22ND STREET
3. SEDIMENT/EROSION CONTROLS AT NORTH PERIMETER NEED TO BE INSTALLED (PER JOB SUPER INSTALLED ON N SIDE OF CHAIN LINK FENCE-CK AT NEXT INSPECTION)
4. NEW CONCRETE WASH OUT ESTABLISHED
11/02/2005 STORMWATER FOLLOW-UP INSP Partial Approval ALL SWPPP INSTALLED

RICHARD LOPEZ W/ SWPPP MAINT SERVICE 520 834 5434 HAS CONTRACT FOR SWPPP MAINT. 24 EMERGENCY SVC AVAILABLE AT THAT NUMBER.
10/27/2005 STORMWATER FOLLOW-UP INSP Correction Required MET WITH BOB MOLLORY 10/28 907-6028

RE-ESTABLISH SILT FENCE ALONG NORTH PERIMETER

INSTALL SILT FENCE PER PLAN ALONG NE SIDE OF PROJECT

RE-SET/REPAIR SILT FENCE AT BOTTOM OF SLOPE ON SE SIDE OF PROJECT TO REAR OF MATERIALS YARD

RESTAKE/REPLACE STRAW BALES AT SE PERIMETER

CLEAR S.C.E. ROCK FROM COT RIGHT OF WAY

USE CONCRETE WASH OUT