Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T04BU03002
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | AP | |
| 06/27/2005 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | PRECONSTRUCTION MEETIN OCCURED ON THIS DATE WITH KB REPRESENTATIVES AND SITE SUPERINTENDENT. SITE IS IN GOOD SHAPE WITH MOST OF THE BMP'S IN PLACE. REMAINING BMP'S WILL BE INSTALLED AFTER ROUGH GRADING HAS MADE MORE PROGRESS AND FURTHER UNDERSTANDING OF HOW AND WHERE THE BMP'S WILL BE NEEDED. SITE WILL BE RE-VISITED ON THE 27TH. | |
| 05/13/2005 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | THIS SITE IS IN GOOD HANDS WITH BOB MOLLERY IN CONTROL OF THE SWPPP PLAN AND MONITORING. I KNOW THIS PERSON AND HAVE TALKED IN LENGHT ABOUT SWPPP REQUIREMENTS AND HE HAS GOOD UNDERSTANDING OF ALL THE COMPLIANCE ISSUES THAT HE FACES WITH THE COT, ADEQ AND EPA. THIS SITE HAS ALREADY BEEN POSTED WITH THE CORRECT AZPDES INFORMATION. STABILZED ENTRACE AND SILT-FENCING INSTALLED WHERE APPROPRIATELY NEEDED. NO OTHER STORM WATER CONCENRS AT THIS TIME. |