Permit: T04BU02927

Parcel: 116276130

Inspection Status: Approved

Inspection History: POOL/SPA PRE-GUNITE

Date Description Inspector Results Comments
01/06/2005 POOL/SPA PRE-GUNITE Approved IVRS - Inspection :*
12/21/2004 POOL/SPA PRE-GUNITE Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) POOL HEATER REQUIRES TEMP/PRESSURE RELIEF VALVE
2) YOUR PLAN DOES NOT INCLUDE A PLUMBING PLAN OR AN APPROVED DESIGN OF THE ATMOSPHERIC VACCUM RELIEF SYSTEM REQUIRED BY 2003 IRC SECTION AG 106
3) PROVIDE GAS LINE SIZE AND LENGTH ON PLAN AND HEATER DEMAND
4) ELECTRIC CONDUIT AND BONDS OK WIRES NOT PULLED
5) 3" CLEARANCE REQUIRED BETWEEN REBAR AND ?
6) PROVIDE APPROVED DESIGN FOR NEGATIVE EDGE AT SPA
7) SPA SPILL WAY REQUIRES 3-#3 BARS EACH SIDE DETAIL 6
8) 1 1/2" CLEARANCE REQUIRED BETWEEN PLUMBING AND REBAR