| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2007 | GRADING - INTERMEDIATE | Approved | SCOUR AT DRAINAGEWAY SOUTH OF OFFICE DRAINAGE NOTCH CUT INTO DRAINAGE WAY AT NORTH END OF PROJECT NOT ON PLAN |
|
| 04/16/2007 | GRADING - INTERMEDIATE | Continued | LOADER ON SITE WORK HAPPENING AT SE CORNER OF THE SITE NO CONTACT WITH GARY BROWN |
|
| 03/20/2007 | GRADING - INTERMEDIATE | Continued | STOCK PILE STILL ON SITE DIRT RAMP IN DRIVEWAY STILL WORK IN LINEAR PARK HAS BEEN DONE-NOT SURE IF IT HAS BEEN COMPLETED/ACCEPTED BY PCFCD |
|
| 02/01/2007 | GRADING - INTERMEDIATE | Continued | SEE PIC 1998 WORK IN LINEAR PARK |
|
| 01/08/2007 | GRADING - INTERMEDIATE | Continued | SOUTH OUTLET PIPES HAVE BEEN BACK FILLED IN LINEAR PARK | |
| 10/30/2006 | GRADING - INTERMEDIATE | Continued | MET WITH BILL ZIMMERMAN FROM PCFCD A LETTER IS TO BE MAILED TO PROPERTY OWNER STOP WORK IN EFFECT UNTIL PC PERMITS ARE OBTAINED BY OWNER FUP AND RIGHT OF WAY ARE NEEDED PER PC CONDITIONS FOR 1ST FUP NOT MET PER PC- AS BUILTS WERE TO HAVE BEEN PROVIDED W/I 30 DAYS OF WORK NONE HAVE BEEN SUBMITTED |
|
| 10/25/2006 | GRADING - INTERMEDIATE | Violation | NO ADDITIONAL WORK DONE ON SITE | |
| 09/29/2006 | GRADING - INTERMEDIATE | Violation | NO ADDITIONAL WORK DONE ON SITE | |
| 08/31/2006 | GRADING - INTERMEDIATE | Violation | NO ADDITIONAL WORK | |
| 07/27/2006 | GRADING - INTERMEDIATE | Violation | SEE PICS 650-652 RAIN TODAY-PANTANO WASH RUNNING |
|
| 07/12/2006 | GRADING - INTERMEDIATE | Violation | NO ADDTIONAL WORK | |
| 07/10/2006 | GRADING - INTERMEDIATE | Violation | NO ADDITIONAL WORK DONE MEETING TO BE BETWEEN MATT FLICK AND BILL ZIMMERMAN |
|
| 07/06/2006 | GRADING - INTERMEDIATE | Violation | SEE PICS 466-475 BILL ZIMMERMAN TO CONTACT MATT FLICK REGARDING THIS PROJECT NO ADDITIONAL WORK HAS BEEN DONE ONSITE |
|
| 06/30/2006 | GRADING - INTERMEDIATE | Violation | MET WITH BILL ZIMMERMAN PCFCD 243-1800 WE WALKED THE A-ATLAS SITE NO APPROVAL HAS BEEN GIVEN FOR CHANGES MADE TO DRAINAGE ON THE NORTH OR SOUTH SIDE OF THIS PROJECT AN EASEMENT MAY BE NEEDED THRU THE LINEAR PARK BILL IS TO CONTACT MATT FLICK TO VERIFY CHANGES TO THE EXISTING COT APPROVED PLAN |
|
| 06/27/2006 | GRADING - INTERMEDIATE | Violation | NO ADDTIONAL WORK DONE | |
| 06/21/2006 | GRADING - INTERMEDIATE | Violation | NO ADDTIONAL WORK DONE | |
| 06/20/2006 | GRADING - INTERMEDIATE | Violation | NO FURTHER WORK DONE TODAY | |
| 06/19/2006 | GRADING - INTERMEDIATE | Violation | STOP WORK ORDER ISSUED FOR THIS SITE WORK IS CONTINUING NO PC OR PCFCD PERMIT ISSUED-PER GARY BROWN PERMIT HAS BEEN APPLIED FOR |
|
| 06/14/2006 | GRADING - INTERMEDIATE | Violation | POSTED STOP WORK NOTICE AT SITE SEE PICTURES 1-9 NO REVIEW HAS BEEN SUBMITTED OR APPROVED BY PCFCD OR COT FOR THE CHANGES TO THE DRAINAGE. ALL DISTURBED AREAS MUST BE RESTORED TO PRE CONSTRUCTION CONDITION IN COT AREA AND PCFCD AREA UNLESS PCFCD DEEMS OTHERWISE |
|
| 06/13/2006 | GRADING - INTERMEDIATE | Correction Required | SAW DRAINAGE WORK PIPES HAVE BEEN PLACED AND SOIL CEMENT HAS BEEN REMOVED AT THE PANTANO WASH-PER GARY THIS IS NOT TO PLAN NO REVIEW BY PC OR COT HAS BEEN DONE-HE WILL BE AS-BUILTING THE CHANGES TO THE PLAN/DESIGN |
|
| 06/06/2006 | GRADING - INTERMEDIATE | Correction Required | NO WORK STARTED ON DRAINAGE CORRECTION RCP PIPE HAS BEEN DELIVERED AND IS SITTING ON SITE |
|
| 05/09/2006 | GRADING - INTERMEDIATE | Correction Required | SPOKE TO RUSSEL LETTER FOR DRAINAGEWAY HAS BEEN DRAFTED(NOT RCVD) |
|
| 04/07/2006 | GRADING - INTERMEDIATE | Correction Required | 1. BUILD DRAINAGEWAY PER PLAN ON S.E. SIDE OF PROJECT. REPLACE DIRT/CONCRETE TO ORIGINAL DESIGN. STABILIZE ANY DISTURBED AREAS. 2. HAVE CHANGE TO CATCH BASIN PIPE (SIZE AND TYPE) REVIEWED AND APPROVED BY C.O.T. 3. HAVE CHANGE TO N. DRAINAGEWAY (ALREADY APPROVED BY P.C.F.C.D.) REVIEWED AND APPROVED BY C.O.T. 4. RE-ESTABLISH S.W.P.P.P. CONTROLS ALONG N. SIDE OF SITE. 5. ENSURE GRADING PLAN NOTE #15 IS FOLLOWED BY DEPRESSING ALL LANDSCAPE AREAS 6" FOR WATER HARVESTING. PICTURES ATTACHED |