Permit: T04BU02749

Parcel: 13601008G

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
09/12/2007 STORMWATER FOLLOW-UP INSP Approved CLOSE OUT PERMIT
12/27/2006 STORMWATER FOLLOW-UP INSP Correction Required NO CHANGE IN SITE
10/03/2006 STORMWATER FOLLOW-UP INSP Correction Required NO FURTHER WORK ONSITE
08/14/2006 STORMWATER FOLLOW-UP INSP Correction Required NEW STOCK PILES OF SAND ON SITE...NO NEW WORK
05/19/2006 STORMWATER FOLLOW-UP INSP Partial Approval OK FOR TEMP C OF O FOR OFFICE-NEW BOND FOR TCO MUST BE POSTED AND REQ FORM FILLED OUT
BOND FOR $25,000 POSTED TO ENSURE THE FOLLOWING:
"A) Construction of the stormwater outfall to the Pantano Wash as shown on the approved grading plan. B) Removal of the constructed channel on Pima County property and final site stabilization of the entire site.
03/21/2006 STORMWATER FOLLOW-UP INSP Partial Approval STRAW BALES WERE PLACED AS REQUESTED
CONCRETE BEING FINISHED ON NE CORNER OF PROJECT
WORKERS PROMISED TO PLACE STRAWBALE AT OUTLET WHEN CONCRETE WAS SET.
03/17/2006 STORMWATER FOLLOW-UP INSP Partial Approval INSTALL SEDIMENT CONTROLS BEFORE STORMWATER LEAVES THE SITE AND ENTERS THE PANTANO WASH
MET ON SITE WITH GARY
02/22/2006 STORMWATER FOLLOW-UP INSP Partial Approval AZPDES STILL POSTED
MOST OF THE SITE HAS BEEN PAVED
CATCH BASINS NOT PROTECTED WILL NEED TO BE CLEANED OUT BEFORE FINAL GRADING IS APPROVED
01/24/2006 STORMWATER FOLLOW-UP INSP Partial Approval AZPDES IN WHITE BOX AT NEW OFFICE (STORAGE ENTRANCE)
01/23/2006 STORMWATER FOLLOW-UP INSP Correction Required POST GREEN AZPDES PROVIDED TO BE IN COMPLIANCE (MET WITH GARY)
FOLLOW UP INSP 1/24
12/14/2005 STORMWATER FOLLOW-UP INSP Correction Required SWPPP STILL NOT POSTED.

MAILED GREEN POSTING TO A-ATLAS ATTN: PROJECT SUPERINTENDENT
11/29/2005 STORMWATER FOLLOW-UP INSP Correction Required 1. RE-POST SWPPP (VANDALISM)
2. RE-ESTABLISH SILT FENCE ALONG NORTH PERIMETER
11/03/2005 STORMWATER FOLLOW-UP INSP Correction Required 1. RE-POST SWPPP (VANDALISM)
2. RE-ESTABLISH SILT FENCE ALONG NORTH PERIMETER
3. NEW CONCRETE WASH OUT TO BE INSTALLED
07/20/2005 STORMWATER FOLLOW-UP INSP Partial Approval PARTIAL SILT FENCE REPAIR HAS BEEN PERFORMED. CONTACT WAS MADE WITH THE CONTRACTOR DAVID, 240-7714, AND EXPLAINED THAT MORE REPAIR IS NEEDED. REINSPECTION WILL BE PERORMED ON FRIDAY, JULY 22ND.
07/18/2005 STORMWATER FOLLOW-UP INSP Correction Required SITE NEEDS SILT FENCE MAINTENANCE ALONG THE N. AND E. PARIMETERS. CONTACTED THE PERSON IN CHARGE OF SWPPP OFF THE CONSTRUCTION ENTRANCE POSTING REQUIREMENTS, (RUSSELL SHAW). RUSSELL EXPLAINED HE WOULD HAVE THIS ADDRESSED THIS WEEK. WILL RE-INSPECT ON THURSDAY THE 21ST.
07/12/2005 STORMWATER FOLLOW-UP INSP Correction Required SILT FENCING NEEDS REPAIRED ALONG THE NORTHERN BORDER AND SOME ON THE EASTERN BORDER. TALKED WITH THE SUPERINTENDENT, DAVID, AND HE EXPLAINED HE WOULD TALK WITH GARY BROWN THE OWNER TO HAVE IT ADDRESSED ASAP. RE-INSPECTION ON FRIDAY THE 15TH.
06/09/2005 STORMWATER FOLLOW-UP INSP Partial Approval THIS SITE IS IN THE PROCESS OF LOCATING FINAL GRADE WITHIN THE SITE. PLANS HAVE BEEN RE-SUBMITTED TO 201 N. STONE FOR REVISION APPROVAL. AZPDES HAS BEEN POSTED. NO STORM WATER CONCERNS AT THIS TIME.